E. Attia, P. Duquenne, and J. Et-le-lann, Problème d'affectation flexible des ressources humaines : Un modèle dynamique, 12ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, pp.697-698, 2011.

C. D. Bailey, Forgetting and the Learning Curve: A Laboratory Study, Management Science, vol.35, issue.3, pp.340-352, 1989.
DOI : 10.1287/mnsc.35.3.340

D. J. Davis, H. V. Kher, and B. J. Et-wagner, Influence of workload imbalances on the need for worker flexibility, Computers & Industrial Engineering, vol.57, issue.1, pp.319-329, 2009.
DOI : 10.1016/j.cie.2008.11.029

E. L. Demeulemeester and W. Et-herroelen, Project scheduling: a research handbook, 2002.

L. Drezet and J. Et-billaut, A project scheduling problem with labour constraints and time-dependent activities requirements, International Journal of Production Economics, vol.112, issue.1, pp.217-225, 2008.
DOI : 10.1016/j.ijpe.2006.08.021

URL : https://hal.archives-ouvertes.fr/hal-01022175

P. Duquenne, H. K. Edi, and J. Et-le-lann, Characterization and modelling of flexible resources allocation on industrial activities, 7th World Congress of Chemical Engineering, 2005.

H. K. Edi, Affectation flexible des ressources dans la planification des activités industrielles: prise en compte de la modulation d'horaires et de la polyvalence, Thèse, 2007.

G. Eitzen, D. Panton, and G. Et-mills, Multi-Skilled Workforce Optimisation, Annals of Operations Research, vol.127, issue.1-4, pp.359-372, 2004.
DOI : 10.1023/B:ANOR.0000019096.58882.54

L. Franchini, E. Caillaud, P. Nguyen, and G. Et-lacoste, Workload control of human resources to improve production management, International Journal of Production Research, vol.39, issue.7, pp.1385-1403, 2001.
DOI : 10.1080/00207540010022322

URL : https://hal.archives-ouvertes.fr/hal-01703124

W. Golden and P. Powell, Towards a definition of flexibility: in search of the Holy Grail?, Omega, vol.28, issue.4, pp.373-384, 2000.
DOI : 10.1016/S0305-0483(99)00057-2

W. J. Gutjahr, S. Katzensteiner, P. Reiter, C. Stummer, and M. Et-denk, Competence-driven project portfolio selection, scheduling and staff assignment, Central European Journal of Operations Research, vol.28, issue.3, pp.281-306, 2008.
DOI : 10.1007/978-3-662-03315-9

URL : http://homepage.univie.ac.at/walter.gutjahr/papers/CompProjPortSel_Rev1.pdf

C. Heimerl and R. Et-kolisch, Scheduling and staffing multiple projects with a multi-skilled workforce, OR Spectrum, vol.44, issue.5, pp.343-368, 2009.
DOI : 10.1007/s00291-009-0169-4

O. Hlaoittinun, E. Bonjour, and M. Dulmet, Managing the Competencies of Team Members in Design Projects through Multi-period Task Assignment, Dans Collaborative Networks for a Sustainable World IFIP Advances in Information and Communication Technology, p.338345, 2010.
DOI : 10.1007/978-3-642-15961-9_40

URL : https://hal.archives-ouvertes.fr/hal-01055974

M. Y. Jaber and M. C. Bonney, Production breaks and the learning curve: The forgetting phenomenon, Applied Mathematical Modelling, vol.20, issue.2, pp.162-169, 1996.
DOI : 10.1016/0307-904X(95)00157-F

URL : https://doi.org/10.1016/0307-904x(95)00157-f

H. Li and K. Et-womer, Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm, Journal of Scheduling, vol.170, issue.6, pp.281-298, 2009.
DOI : 10.1007/978-3-662-22341-3

V. Valls, A. Perez, and S. Quintanilla, Skilled workforce scheduling in Service Centres, European Journal of Operational Research, vol.193, issue.3, pp.791-804, 2009.
DOI : 10.1016/j.ejor.2007.11.008

, Axx-7

E. Vidal, P. Duquenne, and H. Et-pingaud, Optimisation des plans de charge pour un flow-shop dans le cadre d'une production en Juste A Temps: 2-Formulation mathématique. Dans 3ème Congrès Franco-Quebequois de Génie Industriel, pp.1175-1184, 1999.

T. Wright, Factors Affecting the Cost of Airplanes, Journal of the Aeronautical Sciences, vol.3, issue.4, pp.122-128, 1936.
DOI : 10.2514/8.155